Prior to overall application, always test the cleaner (minimum
4' x 4' area) to ensure suitability and desired results. Test each
type of masonry and each type of stain. Allow test area to dry for 3 - 7 days before inspection and approval by the project architect or building owner. Clean test areas according to the application below and always make sure the test panel is available throughout the cleaning project.
|
|
|